Built Safe. Built Right. Built on Schedule.

Built Safe.

Energized work leaves no margin for a bad day. Our safety program is written for high-voltage electrical construction and enforced in the field every day. It rests on five commitments.

  1. 01

    Standards

    OSHA 1910.269, 1926 Subpart V, NFPA 70E and each client's site rules.

  2. 02

    Qualified

    Energized work only by qualified electrical workers trained for the voltage class and the task.

  3. 03

    Planned

    A site safety plan, hazard analysis, and switching and clearance procedures, all completed in LAUNCH before we mobilize.

  4. 04

    Reviewed

    Safety opens every weekly LIVE review, with near misses and leading indicators first.

  5. 05

    Stop work

    Any person on an Althea site can stop work without consequence.

The program

  • A library of 28 Althea HSE procedures covers electrical safety, LOTO, switching and clearance, lifting, and the other hazards of our scope.
  • A site-specific safety plan and emergency response plan are issued for every project before mobilization.
  • Leading indicators, near misses and field observations are reviewed weekly, before schedule or cost.

Team credentials

  • HV Authorized Switchman
  • NFPA 70E Instructor
  • OSHA 510
  • OSHA 10 and 30
  • Lift Director
  • LOTO

Need our safety program or prequalification documents? Request them

Built Right.

Our quality management system is built on the ISO 9001:2015 framework. It follows the standard's plan-do-check-act cycle, and each step is tied to a phase of our delivery program: pre-job planning (LAUNCH), monitor and control (LIVE), and job close-out (LANDED).

01 PLAN LAUNCH 02 DO LIVE 03 CHECK LIVE 04 ACT LANDED BUILT ON ISO 9001:2015 FRAMEWORK
Plan
A Construction Quality Plan for every project in LAUNCH, with Inspection and Test Plans and hold and witness points.
Do
Calibrated tools, controlled documents, torque and termination control, and MV and HV terminations by factory-certified splicers.
Check
Field inspections, NETA acceptance testing by a certified third party, and quality KPIs reviewed weekly in LIVE.
Act
Nonconformance reports, root-cause analysis, and lessons learned carried into the next LAUNCH.